King Liberty Pedestrian/Cyclist LInk

Study Overview
The City of Toronto has initiated a Municipal Class Environmental Assessment Study to determine possible locations for the construction of a pedestrian/cyclist link through the CN/CP railway corridor between
Atlantic Avenue and Strachan Avenue
, along with a workplan for achieving this pedestrian/cyclist link. The link is to be accessible to all pedestrians and cyclists. A pedestrian/cyclist link would result in an enhanced pedestrian and cyclist environment, allowing for improved access between the communities north and south of the CN/CP railway tracks.
The study area is bounded by Queen StreetWest to the north, CN railway corridor to the south,
Strachan Avenue to the east and Atlantic Avenue
to the west.

Public Consultation
Two Public Information Centres (PICs) are planned for this study. The first
PIC is tentatively scheduled for early March 2010. At the PICs staff will be available to answer your questions and concerns, and receive your comments. More information will be made available closer to the date of the first PIC.

We would like to hear from you:
Public consultation is an important part of this study. If you would like more information, or would like to be placed on the study mailing list, please contact:

Cheryl Dow
Public Consultation Coordinator, City of Toronto, Metro Hall, 19th Floor, 55 John St. Toronto, ON M5V 3C6 Tel: 416- 392-4312 Fax: 416-392-2974 TTY: 416-397-0831
cdow@toronto.ca
toronto.ca/involved/projects

King Liberty Notice