Georgetown South Project Update

Bloor St. W. Bridge Work – Sunday Hours

What’s happening
• GO continues to renovate the old spans on the Bloor St. W. bridge between Dundas St. W. and Perth Ave. Please note: in the coming months GO expect to work on most Sundays from 7:00 a.m. to 7:00 p.m. to complete this work as soon as possible.

How this work will affect you
• Any noisy work will only take place after 9:00 a.m. on Sundays.
• Regular work hours are Monday to Saturday from 7:00 a.m. to 7:00 p.m.
Work will be completed in three stages lasting approximately three months with different lane/sidewalk restrictions.

o Stage 1: Both westbound lanes are closed with traffic reduced to one lane in each direction using the eastbound lanes; the north sidewalk adjacent to the westbound lanes is closed. The north sidewalk is expected to reopen at the beginning of September.

o Stage 2: Beginning in September, both eastbound and westbound will be reduced to one lane, with vehicles using the lanes closest to the curb; both sidewalks will be open

o Stage 3: In December, both eastbound lanes will be closed and traffic will be reduced to one lane in each direction using the westbound lanes; the south sidewalk adjacent to the eastbound lanes will be closed

• During sidewalk closures, pedestrians will be directed to cross the street at the nearest signalized intersection and use the sidewalk on the other side of the road

20140822-Bloor_Bridge_Construction_Update_FINAL-page-001