Sewage Line Maintenance at Parkside Drive and Bloor St

The City of Toronto will conduct seasonal maintenance work on the sanitary sewer underground standby storage tanks for about three weeks. The tanks are located approximately 100 meters south of Bloor St west of Parkside Drive in High Park. This work will help clear the drainage system to reduce the risk of basement flooding. This work will require the occupation and temporary closure of the right south bound curb lane starting 100 meters south of Bloor Street for approximately 60 meters.

More information can be found in the attached flyer from Construction Services below.

2017 May High Park Sewer Maintenance