Power Outage – Public Meeting

Dear All,

The recent blackout was a problem for many of us. Personally, I still can’t believe that when I woke up Friday morning my house was cold enough I could see my breath. Together with Cheri Di Novo I hosted a meeting to explain the event, answer questions and take suggestions for how the City can do better. Below are minutes of the meeting. Please let me know it there is any more I can do.

Gord

Minutes from the Post-Blackout Community Meeting on January 22nd, 2009

Parkdale Public Library

7-8 pm

MPP Cheri Di Novo

Councillor Gord Perks, Councillor, Ward 14, Parkdale High Park

Representatives from Toronto Hydro:

Blair Peberdy, Ivano Labricciosa, Ben LaPianta,

Representatives from Hydro One:

Laura Cook, Mike Penstone,

Representatives from the City of Toronto

Kevin Sack, Director of Corporate Communications

Nestor Uhera, Energy Efficiency Office

MPP Di Novo opened the meeting and welcomed everyone and explained the format for the meeting. She also thanked some of the community leaders who helped get the meeting organized.

Councillor Perks thanked City staff, the emergency operations staff and communications staff for a job well done.

Hydro One explained what caused the outage and what they are doing to avoid it happening again. Mike Penstone also apologized for the inconvenience it caused. He used a diagram of the transformer station to show what happened in the shared Hydro One and Toronto Hydro facility.

Mike showed the very large transformers and the fire protection system (deluge spray valve – six of them connected to a high pressure system). The valve open accidentally and caused a lot of water to pour into the station. Water drains into a holding tank (because the water could be mixed with oil) to protect the environment. The holding tank filled beyond capacity and water reached the equipment owned by Toronto Hydro. Also, The Hydro One equipment and sprinklers are on the floor above the Toronto Hydro equipment. There was some leaking into the Toronto Hydro Section. To prevent the water from contacting live transformers Toronto Hydro disconnected power. This prevented a much more serious and long lasting outage.

Toronto Hydro then had to dry and test the equipment to get it back in service. Hydro One has launched an investigation on what made the valve open and what is required in a new system to avoid this. Hydro One also noted that this equipment also sprayed water on the transformers during the big blackout and thought they had solved the problem with water going into the basement when the valve malfunctions.
Hydro One stated clearly they are now going to replace the entire fire suppression system, probably by the end of 2009. No specific date was provided. No decision has been taken about which fire suppression system will be used, however it should be noted that this project is the top priority at Hydro One. Hydro One feels that water fire suppression has some advantages in terms of cooling equipment and ease of clean-up.

Toronto Hydro then spoke and apologized for the outage and recognized the issues it caused. Toronto Hydro is a customer of Hydro One.Toronto Hydro spoke about the tough job it is to communicate during a power outage overnight. They spoke to media continuously throughout the blackout. Hydro answered 45000 calls in 24 hours – well beyond their maximum. First hour of the outage caused the telephone system to fail temporarily immediately after the blackout started. They are going to expand the capacity of their phone lines and it is a priority for their company.

QUESTIONS/CONCERNS:

Q: Residents wanted to know why they were last to get power back?

A: Hydro explained how each part of the station was put back online (lines need to dry out fully in order for them to work) and the fact that the part that feeds this community was the most damaged. Three of the four transformers were able to be restarted after being dried out. The fourth suffered worse damage and needed to be rebuilt. That is why one section of the blacked out area did not get power back until late on Friday.

Q: Hydro was asked why the website did not have information?

A: They were dealing with news media and got to the web later in the morning and that it will also now be a priority. Hydro communications people talked to people on blogs and now know they need to be more pro-active on the Web.

Q: Concerns about elderly and vulnerable and how they are recognized from the street level so people can help each other.

A: Councillor Perks clearly explained the many things the City did to check on vulnerable.

  • 7 receptions centres open, including one overnight reception centre
  • city health inspectors visited over 1000 restaurants and food premises providing information on safe food handling during a power outage
  • city staff visited 120 rooming houses to make contact with residents and help them get to warming centres
  • public health officials also made contact with at risk people, including new and pregnant mothers, homeless and the elderly
  • Solid Waste Management staff as well as staff from Transportation and Public Health knocked on doors of those residents that participate in their programme (side door collection, sidewalk clearing, etc)
  • for those unable to check in on loved ones or elderly neighbours/friends, Access Toronto (416-338-0338) arranged for visits from staff from Transportation, Solid waste Management, or Public Health who worked together to check on residents

Concerns about radio stations and targeted announcements asking for timed messages.

Q: Conflicting information on freezing pipes and need to send correct information out.

A: All agreed that more work needed to be done to ensure that the information being communicated is correct and up to date

Q: Questions about how future questions would be answered if phone lines were overwhelmed.

A: Councillor Perks announced that by the end of 209 a new telephone system will be in place at the City of Toronto – 311. Call 311 for all your inquiries and they will have the most up to date information

Q: How many of these station exist in the city?

A: Over 30 stations connect provincial grid to Toronto Hydro.

Q: Resident pointed out a design flaw in holding tank (no alarm when tank begins to fill).

A: There is a water detector there that Toronto Hydro installed after the 2003 blackout. It helped to ensure water was off quick enough to avoid major problem. Had this not happened the event may have lasted for days.

Q: Concerns about differing explanations of the cause and then the correct explanation came out.

A: Crews arrived and operated in the dark and given the coldest weather of the year assumed it was a water main break. It should have been characterized as maybe a water main break. Hydro took responsibility for the mistake. Hydro apologized for the confusion.

Q: Concerns about power being on in some areas, off in others.

A: Hydro explained how they distribute power through lines with a given capacity that can fit a given geographical area. Also some places have dedicated feeders for large loads (Hospitals, large manufacturing facilities, etc). It should also be noted that Hospitals have their own back up generators.

Q: Will station be staffed until problem has been rectified?

A: The station is now staffed 24/7 until issued is solved.

Q: Asked for “doors open” to come and see the station.

A: Toronto Hydro is willing to take people on tours. Hydro One is concerned due to the high voltage. Toronto Hydro will consider placing images of the vault on the web.

Q: One resident, a former European electrician, said he doesn’t feel like Toronto is first world. Feels that water is inappropriate suppression device and that current system is doomed to fail.

A: Toronto Hydro doesn’t use water for suppression but Hydro One does. Also, Councillor Perks talked about how brittle and fragile the provincial electricity system is with large centralized generators and transmission choke points. Toronto is examining multiple “distributed” generators, and an interconnected “smart grid” That’s why we need to install things like windmills so we have other sources of power. Councillor Perks also explained need to fix old infrastructure and Toronto Hydro’s plan.

Q: Concern about whether or not the city is prepared for a city-wide emergency.

A: Councillor Perks responded to this question and highlighted the planning guide that’s on the web (www.toronto.ca/oem). Councillor Perks also stated city staff at all levels responded very well and reassured residents that we are prepared but there is always room for improvement. Councillor Perks also highlighted what police, TTC, public health, transportation and shelter staff did to respond during the outage.

Q: When will this problem be fixed?

A: Hydro One said they will hopefully repair problem by the end of the year. They are currently looking at which fire suppression system is the best for type of facility.

Q: One resident said City should have its own radio station.

A: Some residents said radio stations did not do enough.

Q: Resident complained about the Toronto Star report on Sunday and said she is facing 20 to 30 thousand in damage and wants to know who to sue.

A: Hydro One said residents should look at their home insurance.

Q: Residents with boiler systems said they need different advice as they are on different systems. Boiler cracked and people need advice on what to do. Insurance won’t cover the boiler.

A: Councillor Perks will alert the Office of Emergency Management and ask that this information be included in the guide available online (www.toronto.ca/oem)

Q: Resident asked that information on the specific locations of the outage be available in real time during an outage.

A: Toronto staff explained the map that was developed and posted online and Hydro undertook to do better at this in future.

Toronto Hydro has committed to putting together a newsletter to advise residents of what is happening and what will be done to rectify the problem as well as other important information relating to power outages. The newsletter will be distributed within the next few weeks.